The hedge separating our property from our neighbours' is badly overgrown. It's actually their hedge, but they do nothing about it so if the front of our house is to look decent there's nothing for it but "do-it-yourself". Renovating a hedge requires cutting it right back one side at a time. Last year I renovated our side, and this year am reducing the height. I will get it down to a height which I can manage to trim with the electric hedge trimmer. However, there is so much of it that it will take several weeks; the local council helpfully empties our garden wheelie bins weekly, but I can fill both my bin and my neighbours' very quickly with what I'm cutting out of the hedge! Here's what it looks like after two weeks of cutting - only about one third of it done so far:
Once the height has been reduced, I'll reduce the width on the neighbours' side too.
Thursday, 23 April 2015
Saturday, 11 April 2015
Fans started
Thursday, 9 April 2015
Progress at slug's pace
Hours and hours in the garden over the last couple of days to achieve - well, not very much by the look of it. Extending the patio over where a fishpond used to be seemed like a good plan - there were brick paviors laid either side of the gap - so it just needed to be levelled and joined with more paviors - sounds so simple. Unfortunately there is just not quite enough space between the two already paved areas to make a seamless join without a lot of fiddling about - only millimeters extra needed but there is absolutely no "give" in these paving blocks, so the only way to get them to join up is to remove the pips off the ends and/or sides of the paviors with an angle grinder - one by one, until enough have been removed to get the blocks to join up. Hours of fun! and I'm not quite half-way with it yet.
The reason the header included "slug" not "snail" was that several of the bags of sand had attracted some of the biggest slugs I've ever seen in the UK - they were put out for bird food, and I think some birds have a full stomach today, as I could see slug trails ending in the middle of nowhere.
On a more positive note, the water butt is installed - just waiting for some rain now to see if it fills up!
Also, wires have been installed on the wall between the fruit trees - I hope to train gooseberry and redcurrant plants into fans against that wall. As the redcurrant I planted in the autumn didn't survive, I have a replacement on order (Rondom again - we used to have three very productive Rondom plants so I'm keen to keep to that variety). It's not the best time of year for planting but I don't want to waste another year before getting going on the fan training.
Where the two above-ground fishponds used to be, I plan a raised bed - but before this can be constructed, the foundations for the supporting walls need to be made good. This first stage is almost complete so bricklaying should begin in the not too distant future - which will serve the dual purpose of creating the new raised bed and reducing the stacks of reclaimed bricks cluttering up the garden! That in itself would make a huge difference to the appearance - actually it will serve a third purpose too, as it will give me somewhere to put the soil being excavated from other parts to lay paving.
The reason the header included "slug" not "snail" was that several of the bags of sand had attracted some of the biggest slugs I've ever seen in the UK - they were put out for bird food, and I think some birds have a full stomach today, as I could see slug trails ending in the middle of nowhere.

Also, wires have been installed on the wall between the fruit trees - I hope to train gooseberry and redcurrant plants into fans against that wall. As the redcurrant I planted in the autumn didn't survive, I have a replacement on order (Rondom again - we used to have three very productive Rondom plants so I'm keen to keep to that variety). It's not the best time of year for planting but I don't want to waste another year before getting going on the fan training.

Monday, 6 April 2015
Off again in London
Last September I was beginning to get to grips with re-building the back garden in London, and had got as far as laying enough of the patio extension to put up the washing line, when I had a fall and broke my left hip. This put me out of gardening action almost completely for a while, and it's only now that six months have passed that I'm able to get down to garden level to do something about it. During the time I was unable to work on it, not only was no progress made but the areas I'd cleared became covered in weeds... the weed suppressant blanket broke up - it really needs to be covered to be effective. The only task I managed - with great difficulty! - was to plant a gooseberry and a redcurrant, which I'd ordered before the accident. Sadly the redcurrant doesn't seem to have survived, though the gooseberry is doing well.
The last few days have finally brought us some reasonable weather; I've removed most of the weeds, cleared a car load of rubbish, and started again with the rebuild. The plan was made last summer, so I know what I'm trying to achieve. I've planted a blackberry (Merton Thornless) and a loganberry (LY654) - the same varieties which used to give us wonderful crops, but which had to go to make room for the conservatory. These are planted on the south side of the garden, and will be trained over arches. I've also put a blackcurrant on the same side, and planted a blueberry in a container (as it needs acid soil).
Today's success was to make a soak-away for the down-pipe from the conservatory roof, and re-lay the end of the path to where the tap and electric socket have been installed. I've also prepared a water butt to stand next to the down-pipe.
Here's the latest "bird's eye" view - still a building site, but a tidier one than it's been for months!

Today's success was to make a soak-away for the down-pipe from the conservatory roof, and re-lay the end of the path to where the tap and electric socket have been installed. I've also prepared a water butt to stand next to the down-pipe.
Here's the latest "bird's eye" view - still a building site, but a tidier one than it's been for months!
Thursday, 15 January 2015
Herby update
![]() |
Spring 2014 - sage plant replaced |
The sage has grown a lot since the new plant was put in less than a year ago - probably needs cutting back a bit, but that's a job for spring time.
Friday, 9 January 2015
Rejuvenating herb wheel
January 2008 |
May 2010 |
Sunday, 8 June 2014
Rain stopped play
Spending the second half of May in London, I was hoping for a chance to do something about the garden... but it rained so often that I only managed two days gardening. One of these was spent half at the front, half in the back.
The front garden doesn't need much maintenance - mainly hedge-trimming. I've reduced the height of the hedge on the northern side so that I can manage to trim it myself, but I can't manage the top of the hedge which divides us from our neighbours at number 9. It's actually their hedge, but as they never do any gardening we've taken it upon ourselves in recent years to trim it - otherwise the appearance of our own house is spoiled. I would like to reduce the height of this hedge too, so that I can reach to trim it, but that's for the future - for now, Mike's higher reach means he cuts the top of this one (this time, he did the sides too).
The back garden was not only looking like a building site since the removal of the ponds, but an overgrown building site at that, having been left to its own devices for some time. My other day-and-a-half of reasonable weather were spent clearing as much as possible of the former ponds area - and having done so, laying a weed suppressant blanket over the cleared ground to prevent a repetition of the jungle appearance, as I'll be away for nearly all of June.
It wasn't just weeding - a car load of rubble was also shifted (retaining bricks which may still be re-used), bagged up and taken to the tip. The new fencing which I started to treat earlier is still unfinished, due to the weather - it can only be done if the timber is completely dry. Blackberry blossoms over the one remaining arch, but I'm concerned that I don't yet see any new canes emerging from the base to provide next year's fruit. I did pick - and share! - the first strawberry of the season. More will ripen while we're away, and I've asked Eva to help herself to them so that they don't go to waste.
While I'm away I should still be able to do something about the London garden - planning! I need to make a priority list of work to be carried out, that which I can do myself and that for which I need help.
The front garden doesn't need much maintenance - mainly hedge-trimming. I've reduced the height of the hedge on the northern side so that I can manage to trim it myself, but I can't manage the top of the hedge which divides us from our neighbours at number 9. It's actually their hedge, but as they never do any gardening we've taken it upon ourselves in recent years to trim it - otherwise the appearance of our own house is spoiled. I would like to reduce the height of this hedge too, so that I can reach to trim it, but that's for the future - for now, Mike's higher reach means he cuts the top of this one (this time, he did the sides too).


While I'm away I should still be able to do something about the London garden - planning! I need to make a priority list of work to be carried out, that which I can do myself and that for which I need help.
Subscribe to:
Posts (Atom)